Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Alkalies and chlorine
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0258 #08 Y:2024 Change rate schedules or other changes in utility service $180,000 $20,000
UU0258 #07 Y:2024 Optimize plant power factor $120,000 $198,000
UU0258 #06 Y:2024 Install compressor air intakes in coolest locations $2,570 $5,140
UU0258 #05 Y:2024 Eliminate or reduce compressed air usage $7,890 $11,500
UU0258 #04 Y:2024 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $1,690,000 $23,500,000
UU0258 #03 Y:2024 Improve combustion control capability $12,600 $54,500
UU0258 #02 Y:2024 Install / repair insulation on steam lines $25,800 $6,200
UU0258 #01 Y:2024 Install smaller boiler (increase high fire duty cycle) $158,000 $725,000
WV0599 #14 Y:2020 Insulate bare equipment $361 $1,123
WV0599 #13 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $1,644 $1,250
WV0599 #12 Y:2020 Utilize energy-efficient belts and other improved mechanisms $3,517 $2,256
WV0599 #11 Y:2020 Recover heat from exhausted steam, hot air or hot water $4,587 $27,500
WV0599 #10 Y:2020 Recover waste heat from equipment $7,356 $21,400
WV0599 #09 Y:2020 Improve combustion control capability $9,278 $8,650
WV0599 #08 Y:2020 Replace obsolete burners with more efficient ones $10,828 $39,480
WV0599 #07 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $12,054 $14,700
WV0599 #06 Y:2020 Develop a repair/replace policy $13,389 $2,433
WV0599 #05 Y:2020 Analyze flue gas for proper air/fuel ratio $15,981 $2,000
WV0599 #04 Y:2020 Use waste heat from hot flue gases to preheat $18,379 $45,860
WV0599 #03 Y:2020 Install outside air damper / economizer on hvac unit $25,793 $83,200