Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,196

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0609 #06 Y:1996 Utilize higher efficiency lamps and/or ballasts $3,245 $4,110
GT0609 #05 Y:1996 Use closed cycle process to minimize waste water production $9,314 $12,000
GT0609 #04 Y:1996 Replace existing equipment with more suitable substitutes $181,260 $181,000
GT0609 #03 Y:1996 Reduce excessive boiler blowdown $3,060 -
GT0609 #02 Y:1996 Use waste heat from hot flue gases to preheat $22,270 $19,740
GT0609 #01 Y:1996 Combine utility meters $78,900 -
UD0513 #08 Y:1996 Meter recycled water (to reduce sewer charges) $110,288 $500
UD0513 #07 Y:1996 Use adjustable frequency drive or multiple speed motors on existing system $3,228 $16,000
UD0513 #06 Y:1996 Utilize higher efficiency lamps and/or ballasts $10,603 $19,910
UD0513 #05 Y:1996 Use most efficient type of electric motors $3,283 $6,465
UD0513 #04 Y:1996 Optimize plant power factor $21,006 $25,000
UD0513 #03 Y:1996 Eliminate leaks in water lines and valves $195,658 $50,000
UD0513 #02 Y:1996 Recover and reuse cooling water $82,538 $50,000
UD0513 #01 Y:1996 Recover and reuse cooling water $82,051 $370,000
OR0288 #06 Y:1996 Utilize energy-efficient belts and other improved mechanisms $2,100 $9,050
OR0288 #05 Y:1996 Use most efficient type of electric motors $390 $1,390
OR0288 #04 Y:1996 Replace existing equipment with more suitable substitutes $529,800 $65,000
OR0288 #03 Y:1996 Modify refrigeration system to operate at a lower pressure $5,140 -
OR0288 #02 Y:1996 Clean condenser tubes $1,270 $5,000
OR0288 #01 Y:1996 Replace hydraulic / pneumatic equipment with electric equipment $6,130 $32,400