ITAC Assessment: AM0296
ITAC logo
ITAC Assessment: AM0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Adhesives, sealants, coatings, and mastics
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 23
Plant Area 68,160
ft2
Annual Production 2,000
Tgal
Production Hrs. Annual 2,100
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,808 977,433
kWh
Electricity Demand $17,143 5,650
kW-mo/yr
Electricity Fees $230 -
Natural Gas $7,089 1,601
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,188 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,868

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Ancillary Material Cost Savings
01 3.6112: Use filter and drying oven to reduce sludge volume $9,900 $46,000 - - $9,900
-
Tgal
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,900 $990 - $7,900
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $4,100 $10,100 - $4,100
-
kW-mo/yr
- -
04 3.5316: Contract a wood pallet recycling company $2,520 - - - - $2,520
05 2.7111: Reduce illumination to minimum necessary levels $780 $80 $560
11,137
kWh
$220
-
kW-mo/yr
- -
06 2.4314: Use synthetic lubricant $720 - $200
3,810
kWh
$520
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $350 - $220
4,396
kWh
$130
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $280 $100 $280
5,569
kWh
- - -
09 2.7124: Make a practice of turning off lights when not needed $480 - $480
9,672
kWh
- - -
10 2.4133: Use most efficient type of electric motors $158 $505 $79
1,465
kWh
$79
-
kW-mo/yr
- -
TOTAL RECOMMENDED $27,188 $57,775 $1,819
36,049
kWh
$12,949
-
kW-mo/yr
$9,900
-
Tgal
$2,520
TOTAL IMPLEMENTED $6,868 $10,785 $1,819
36,049
kWh
$5,049
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs