Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,249

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0395 #06 Y:2026 Use solar heat to make electricty $209,252 $1,881,750
MZ0395 #05 Y:2026 Use waste heat from hot flue gases to preheat $11,132 $80,000
MZ0395 #04 Y:2026 Install occupancy sensors $798 $1,700
MZ0395 #03 Y:2026 Analyze flue gas for proper air/fuel ratio $2,954 $1,000
MZ0395 #02 Y:2026 Chill water to the highest temperature possible $26,240 -
MZ0395 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $2,493 $600
LT8445 #06 Y:2026 Install occupancy sensors $5,585 $462
LT8445 #05 Y:2026 Use solar heat to make electricty $3,325 $45,179
LT8445 #04 Y:2026 Turn off equipment when not in use $1,818 $1,302
LT8445 #03 Y:2026 Modify facility to avoid excess maintenance costs $15,500 $3,029
LT8445 #02 Y:2026 Use photocell controls $15,602 $8,665
LT8445 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $18,570 $25,215
UU0298 #12 Y:2026 Reduce ventilation air $140 $120
UU0298 #11 Y:2026 Pay bills on time to avoid late fees $314 $240
UU0298 #10 Y:2026 Install compressor air intakes in coolest locations $1,100 $6,160
UU0298 #09 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,524 $6,695
UU0298 #08 Y:2026 Turn off equipment during breaks, reduce operating time $3,869 $18,600
UU0298 #07 Y:2026 Apply for tax-free status for energy purchases $4,506 $4,800
UU0298 #06 Y:2026 Use hot process fluids to preheat incoming process fluids $5,332 $21,000
UU0298 #05 Y:2026 Utilize controls to operate equipment only when needed $7,570 $4,800