Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,316

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0617 #10 Y:2026 Use solar heat to heat water $37,530 $282,800
LE0617 #09 Y:2026 Utilize controls to operate equipment only when needed $32,528 $141,920
LE0617 #08 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $61,818 $250,000
LE0617 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $9,955 $23,000
LE0617 #06 Y:2026 Install compressor air intakes in coolest locations $7,303 $8,000
LE0617 #05 Y:2026 Re-use or recycle hot or cold process exhaust air $9,257 $7,500
LE0617 #04 Y:2026 Install occupancy sensors $441 $296
LE0617 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $66,793 $10,200
LE0617 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $17,625 -
LE0617 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $137,524 -
MS0472 #06 Y:2026 Turn off equipment when not in use $9,021 -
MS0472 #05 Y:2026 Install occupancy sensors $277 $1,946
MS0472 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $4,200 -
MS0472 #03 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $174 -
MS0472 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,104 $4,093
MS0472 #01 Y:2026 Moderate cooling tower outlet temperature $1,553 $248
MZ0398 #07 Y:2026 Use waste heat from hot flue gases to preheat $5,416 $60,000
MZ0398 #06 Y:2026 Use solar heat to make electricty $70,342 $285,001
MZ0398 #05 Y:2026 Analyze flue gas for proper air/fuel ratio $6,340 $1,000
MZ0398 #04 Y:2026 Install occupancy sensors $1,099 $2,700