Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,938

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0371 #05 Y:2025 Replace boiler $383,764 $475,000
MZ0371 #04 Y:2025 Use waste heat from hot flue gases to preheat incoming fluids $1,555 $5,880
MZ0371 #03 Y:2025 Use flue gases to heat process or service water $1,063 $3,900
MZ0371 #02 Y:2025 Meter recycled water (to reduce sewer charges) $4,583 $70,000
MZ0371 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,847 $3,600
UU0268 #06 Y:2025 Use optimum temperature $680,810 $2,017,330
UU0268 #05 Y:2025 Convert combustion equipment to burn natural gas $11,222 $30,630
UU0268 #04 Y:2025 Increase amount of condensate returned $31,296 $7,800
UU0268 #03 Y:2025 Install / repair insulation on steam lines $8,514 $6,920
UU0268 #02 Y:2025 Burn a less expensive grade of fuel $101,028 $4,860
UU0268 #01 Y:2025 Use hot process fluids to preheat incoming process fluids $25,676 $9,660
UF0627 #08 Y:2025 Replace old machine with new automatic multi-station tool $41,600 $88,000
UF0627 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,019 $2,949
UF0627 #06 Y:2025 Upgrade controls on compressors $1,094 $2,000
UF0627 #05 Y:2025 Use highest temperature for chilling or cold storage $3,591 -
UF0627 #04 Y:2025 Clean or color roof to reduce solar load $5,567 $9,248
UF0627 #03 Y:2025 Upgrade obsolete equipment $8,759 $32,640
UF0627 #02 Y:2025 Replace existing chiller with high efficiency model $16,402 $72,000
UF0627 #01 Y:2025 Use demand controller or load shedder $19,980 $20,761
WV0678 #19 Y:2025 Reduce ventilation air $631 $2,400