Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,197

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT1000 #08 Y:2025 Optimize plant power factor $1,783 $8,009
GT1000 #07 Y:2025 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $228,801 $603,750
GT1000 #06 Y:2025 Install / repair insulation on steam lines $1,088 $2,460
GT1000 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,128 $6,214
GT1000 #04 Y:2025 Adopt in-house material generation $88,408 $75,000
GT1000 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,557 $1,850
GT1000 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $3,312 $200
GT1000 #01 Y:2025 Apply for tax-free status for energy purchases $55,610 $400
MS0463 #03 Y:2025 Install occupancy sensors $910 $1,118
MS0463 #02 Y:2025 Install timers and/or thermostats $12,340 $1,339
MS0463 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,666 $4,635
MS0457 #03 Y:2025 Replace obsolete burners with more efficient ones $56,120 $321,000
MS0457 #02 Y:2025 Replace fossil fuel equipment with electrical equipment $9,586 $75,000
MS0457 #01 Y:2025 Upgrade obsolete equipment $6,840 $29,366
UW2518 #06 Y:2025 Use or replace with energy efficient substitutes $18,560 $100,800
UW2518 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,286 $28,047
UW2518 #04 Y:2025 Use photocell controls $795 $1,729
UW2518 #03 Y:2025 Install vinyl strip / high speed / air curtain doors $13,675 $64,800
UW2518 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $59,635 $40,500
UW2518 #01 Y:2025 Install back-up equipment $172,619 $196,087