9,372
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DL0275 #07 Y:2026 | 07 | 2026 | Use heat pump for space conditioning | $1,195 | $14,500 |
n/a
|
| DL0275 #06 Y:2026 | 06 | 2026 | Utilize higher efficiency lamps and/or ballasts | $4,492 | $4,837 |
n/a
|
| DL0275 #05 Y:2026 | 05 | 2026 | Use proper thickness of insulation on building envelope | $133 | $125 |
n/a
|
| DL0275 #04 Y:2026 | 04 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $4,007 | $5,500 |
n/a
|
| DL0275 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $12,658 | $19,500 |
n/a
|
| DL0275 #02 Y:2026 | 02 | 2026 | Recover waste heat from equipment | $7,918 | $10,000 |
n/a
|
| DL0275 #01 Y:2026 | 01 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $27,007 | $22,000 |
n/a
|
| UL2610 #09 Y:2026 | 09 | 2026 | Use solar heat to make electricty | $11,785 | $116,051 |
n/a
|
| UL2610 #08 Y:2026 | 08 | 2026 | Utilize higher efficiency lamps and/or ballasts | $2,565 | $11,013 |
n/a
|
| UL2610 #07 Y:2026 | 07 | 2026 | Install occupancy sensors | $102 | $386 |
n/a
|
| UL2610 #06 Y:2026 | 06 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,253 | $315 |
n/a
|
| UL2610 #05 Y:2026 | 05 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $9,804 | $6,617 |
n/a
|
| UL2610 #04 Y:2026 | 04 | 2026 | Optimize plant power factor | $5,290 | $26,000 |
n/a
|
| UL2610 #03 Y:2026 | 03 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $6,056 | - |
n/a
|
| UL2610 #02 Y:2026 | 02 | 2026 | Insulate bare equipment | $2,011 | $1,050 |
n/a
|
| UL2610 #01 Y:2026 | 01 | 2026 | Re-size charging openings or add a movable door on equipment | $286 | $500 |
n/a
|
| SU0604 #09 Y:2026 | 09 | 2026 | Conserve energy by efficient use of vending machines | $47 | $341 |
n/a
|
| SU0604 #08 Y:2026 | 08 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $3,371 | $19,740 |
n/a
|
| SU0604 #07 Y:2026 | 07 | 2026 | Replace fossil fuel equipment with electrical equipment | $7,137 | $24,539 |
n/a
|
| SU0604 #06 Y:2026 | 06 | 2026 | Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $587 | $1,742 |
n/a
|