131
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Blankbooks, looseleaf binders and devices | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
MS0306 #05 Y:2006 | 05 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $948 | $4,566 | |
MS0306 #04 Y:2006 | 04 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,093 | $180 | |
MS0306 #03 Y:2006 | 03 | 2006 | Utilize energy-efficient belts and other improved mechanisms | $4,662 | $2,550 | |
MS0306 #02 Y:2006 | 02 | 2006 | Utilize higher efficiency lamps and/or ballasts | $9,063 | $89,988 | |
MS0306 #01 Y:2006 | 01 | 2006 | Utilize higher efficiency lamps and/or ballasts | $26,113 | $36,171 | |
CO0445 #08 Y:1999 | 08 | 1999 | Re-arrange equipment layout to reduce handling costs | $44,000 | $1,400 | |
CO0445 #07 Y:1999 | 07 | 1999 | Use a less expensive method of waste removal | $140 | - | |
CO0445 #06 Y:1999 | 06 | 1999 | Reuse / recycle/ sell paper products | $360 | - | |
CO0445 #05 Y:1999 | 05 | 1999 | Reduce the pressure of compressed air to the minimum required | $450 | $380 | |
CO0445 #04 Y:1999 | 04 | 1999 | Eliminate leaks in inert gas and compressed air lines/ valves | $680 | - | |
CO0445 #03 Y:1999 | 03 | 1999 | Keep doors and windows shut when not on use | $820 | $1,000 | |
CO0445 #02 Y:1999 | 02 | 1999 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,570 | $1,000 | |
CO0445 #01 Y:1999 | 01 | 1999 | Turn off equipment when not in use | $5,830 | - | |
MS0127 #08 Y:1998 | 08 | 1998 | Install shelves / racks to utilize unused space | $156,180 | $23,010 | |
MS0127 #07 Y:1998 | 07 | 1998 | Condense operation into one building | $115,929 | $8,265 | |
MS0127 #06 Y:1998 | 06 | 1998 | Use re-usable filters | $14,954 | $14,960 | |
MS0127 #05 Y:1998 | 05 | 1998 | Install compressor air intakes in coolest locations | $393 | $101 | |
MS0127 #04 Y:1998 | 04 | 1998 | Use demand controller or load shedder | $3,782 | $11,500 | |
MS0127 #03 Y:1998 | 03 | 1998 | Shut off pilots in standby equipment | $140 | $54 | |
MS0127 #02 Y:1998 | 02 | 1998 | Install timers and/or thermostats | $584 | $236 |