Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

344

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Manifold business forms
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0255 #08 Y:2018 Install compressor air intakes in coolest locations $938 $225
MZ0255 #07 Y:2018 Install occupancy sensors $1,086 $280
MZ0255 #06 Y:2018 Reduce the pressure of compressed air to the minimum required $2,260 $100
MZ0255 #05 Y:2018 Reschedule plant operations or reduce load to avoid peaks $6,457 $3,200
MZ0255 #04 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $6,910 $1,540
MZ0255 #03 Y:2018 Apply for tax-free status for energy purchases $10,288 $1,000
MZ0255 #02 Y:2018 Turn off equipment when not in use $19,908 $25,000
MZ0255 #01 Y:2018 Optimize plant power factor $47,570 $16,500
WM0100 #07 Y:2016 Utilize higher efficiency lamps and/or ballasts $454 $1,600
WM0100 #06 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $1,107 $2,250
WM0100 #05 Y:2016 Install occupancy sensors $1,541 -
WM0100 #04 Y:2016 Utilize higher efficiency lamps and/or ballasts $2,055 $7,820
WM0100 #03 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $2,307 $4,000
WM0100 #02 Y:2016 Use synthetic lubricant $9,329 $21,800
WM0100 #01 Y:2016 Make ice during off peak hours for cooling $42,285 $81,148
OK0928 #13 Y:2015 Turn off equipment when not in use $581 $468
OK0928 #12 Y:2015 Optimize plant power factor $2,621 $20,000
OK0928 #11 Y:2015 Change rate schedules or other changes in utility service $35,000 $70,000
OK0928 #10 Y:2015 Size electric motors for peak operating efficiency $6,912 $5,775
OK0928 #09 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $2,212 $863