ITAC Assessment: OK0928
ITAC logo
ITAC Assessment: OK0928
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Business forms
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2761: Manifold Business Forms
Sales Range $5
M
to 10
M
# of Employees 73
Plant Area 110,000
ft2
Annual Production 10,800
units
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,366 3,641,800
kWh
Electricity Demand $60,620 8,514
kW-mo/yr
Natural Gas $15,678 3,528
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,123 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $92,878

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $21,773 $7,320 $21,773
403,200
kWh
- - -
02 2.6232: Install set-back timers $2,950 $972 $2,223
41,170
kWh
- - $727
-
MMBtu
03 2.7211: Clean and maintain refrigerant condensers and towers $149 $132 $103
1,889
kWh
$46
-
kW-mo/yr
- -
04 2.7496: Install partitions to reduce size of conditioned space $9,143 $18,884 $7,028
130,153
kWh
- - $2,115
-
MMBtu
05 2.2437: Recover waste heat from equipment $988 $2,440 - - - $988
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $10,832 $38,110 $9,174
169,882
kWh
$1,658
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $18,758 $25,753 $16,015
296,570
kWh
$2,743
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,204 $5,149 $1,204
22,304
kWh
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,212 $863 $2,212
40,978
kWh
- - -
10 2.4131: Size electric motors for peak operating efficiency $6,912 $5,775 $6,912
128,013
kWh
- - -
11 2.8114: Change rate schedules or other changes in utility service $35,000 $70,000 - - $35,000 -
12 2.3212: Optimize plant power factor $2,621 $20,000 - - $2,621 -
13 2.6218: Turn off equipment when not in use $581 $468 $581
10,764
kWh
- - -
TOTAL RECOMMENDED $113,123 $195,866 $67,225
1,244,923
kWh
$4,447
-
kW-mo/yr
$37,621 $3,830
-
MMBtu
TOTAL IMPLEMENTED $92,878 $148,299 $52,704
975,993
kWh
$4,447
-
kW-mo/yr
$35,000 $727
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs