Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial printing, lithographic
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KU0140 #15 Y:1984 Preheat boiler makeup water with waste process heat $1,443 $500
KU0140 #14 Y:1984 Improve lubrication practices $5,575 $5,000
KU0140 #13 Y:1984 Use demand controller or load shedder $7,135 $6,000
KU0140 #12 Y:1984 Turn off equipment when not in use $701 $650
KU0140 #11 Y:1984 Repair faulty insulation in furnaces, boilers, etc $192 $194
KU0140 #10 Y:1984 Install / repair insulation on condensate lines $1,942 $3,384
KU0140 #09 Y:1984 Analyze flue gas for proper air/fuel ratio $2,757 $3,000
KU0140 #08 Y:1984 Use computer programs to optimize hvac performance $1,879 $20
KU0140 #07 Y:1984 Use cooling tower or economizer to replace chiller cooling $755 $900
KU0140 #06 Y:1984 Use highest temperature for chilling or cold storage $2,864 $1,500
KU0140 #05 Y:1984 Use adjustable frequency drive or multiple speed motors on existing system $2,911 $4,000
KU0140 #04 Y:1984 Use adjustable frequency drive or multiple speed motors on existing system $13,737 $8,500
KU0140 #03 Y:1984 Use computer programs to optimize hvac performance $9,259 $697
KU0140 #02 Y:1984 Install timers and/or thermostats $6,149 $577
KU0140 #01 Y:1984 Utilize higher efficiency lamps and/or ballasts $3,927 $4,258
KU0030 #06 Y:1981 Redesign process $11,311 $80,000
KU0030 #05 Y:1981 Close holes and openings in building such as broken windows $3,146 $3,500
KU0030 #04 Y:1981 Install timers and/or thermostats $1,297 $500
KU0030 #03 Y:1981 Reduce hot water temperature to the minimum required $439 -
KU0030 #02 Y:1981 Utilize higher efficiency lamps and/or ballasts $2,997 $3,000