96
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Commercial printing, lithographic | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0335 #08 Y:2005 | 08 | 2005 | Use proper thickness of insulation on building envelope | $985 | $1,680 | |
| WV0335 #07 Y:2005 | 07 | 2005 | Burn waste oil for heat | $1,494 | $1,300 | |
| WV0335 #06 Y:2005 | 06 | 2005 | Utilize a less expensive cooling method | $2,785 | $5,803 | |
| WV0335 #05 Y:2005 | 05 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,865 | $1,420 | |
| WV0335 #04 Y:2005 | 04 | 2005 | Develop a repair/replace policy | $6,057 | $240 | |
| WV0335 #03 Y:2005 | 03 | 2005 | Install compressor air intakes in coolest locations | $8,924 | $250 | |
| WV0335 #02 Y:2005 | 02 | 2005 | Use waste heat from hot flue gases to preheat | $127,911 | $14,450 | |
| WV0335 #01 Y:2005 | 01 | 2005 | Use waste heat steam for absorption refrigeration | $151,578 | $97,142 | |
| UD0717 #13 Y:2005 | 13 | 2005 | Upgrade controls on compressors | $441 | $882 | |
| UD0717 #12 Y:2005 | 12 | 2005 | Insulate bare equipment | $670 | $780 | |
| UD0717 #11 Y:2005 | 11 | 2005 | Use optimum thickness insulation | $1,314 | $1,962 | |
| UD0717 #10 Y:2005 | 10 | 2005 | Reduce the pressure of compressed air to the minimum required | $1,845 | - | |
| UD0717 #09 Y:2005 | 09 | 2005 | Install adequate dryers on air lines to eliminate blowdown | $3,658 | $2,526 | |
| UD0717 #08 Y:2005 | 08 | 2005 | Check for accuracy of utility / power meters | $5,395 | - | |
| UD0717 #07 Y:2005 | 07 | 2005 | Utilize higher efficiency lamps and/or ballasts | $8,553 | $11,448 | |
| UD0717 #06 Y:2005 | 06 | 2005 | Analyze flue gas for proper air/fuel ratio | $9,225 | - | |
| UD0717 #05 Y:2005 | 05 | 2005 | Interlock heating and air conditioning systems to prevent simultaneous operation | $12,000 | $2,300 | |
| UD0717 #04 Y:2005 | 04 | 2005 | Repair or replace steam traps | $12,702 | $5,400 | |
| UD0717 #03 Y:2005 | 03 | 2005 | Utilize higher efficiency lamps and/or ballasts | $15,783 | $39,200 | |
| UD0717 #02 Y:2005 | 02 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $40,398 | - |