Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial printing, lithographic
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0335 #08 Y:2005 Use proper thickness of insulation on building envelope $985 $1,680
WV0335 #07 Y:2005 Burn waste oil for heat $1,494 $1,300
WV0335 #06 Y:2005 Utilize a less expensive cooling method $2,785 $5,803
WV0335 #05 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $2,865 $1,420
WV0335 #04 Y:2005 Develop a repair/replace policy $6,057 $240
WV0335 #03 Y:2005 Install compressor air intakes in coolest locations $8,924 $250
WV0335 #02 Y:2005 Use waste heat from hot flue gases to preheat $127,911 $14,450
WV0335 #01 Y:2005 Use waste heat steam for absorption refrigeration $151,578 $97,142
UD0717 #13 Y:2005 Upgrade controls on compressors $441 $882
UD0717 #12 Y:2005 Insulate bare equipment $670 $780
UD0717 #11 Y:2005 Use optimum thickness insulation $1,314 $1,962
UD0717 #10 Y:2005 Reduce the pressure of compressed air to the minimum required $1,845 -
UD0717 #09 Y:2005 Install adequate dryers on air lines to eliminate blowdown $3,658 $2,526
UD0717 #08 Y:2005 Check for accuracy of utility / power meters $5,395 -
UD0717 #07 Y:2005 Utilize higher efficiency lamps and/or ballasts $8,553 $11,448
UD0717 #06 Y:2005 Analyze flue gas for proper air/fuel ratio $9,225 -
UD0717 #05 Y:2005 Interlock heating and air conditioning systems to prevent simultaneous operation $12,000 $2,300
UD0717 #04 Y:2005 Repair or replace steam traps $12,702 $5,400
UD0717 #03 Y:2005 Utilize higher efficiency lamps and/or ballasts $15,783 $39,200
UD0717 #02 Y:2005 Reschedule plant operations or reduce load to avoid peaks $40,398 -