23
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Book printing | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UF0409 #15 Y:2007 | 15 | 2007 | Reuse / recycle/ sell paper products | $46,911 | - | |
| UF0409 #14 Y:2007 | 14 | 2007 | Install back-up equipment | $76,789 | $12,000 | |
| UF0409 #13 Y:2007 | 13 | 2007 | Install occupancy sensors | $1,180 | $162 | |
| UF0409 #12 Y:2007 | 12 | 2007 | Utilize higher efficiency lamps and/or ballasts | $8,401 | $10,282 | |
| UF0409 #11 Y:2007 | 11 | 2007 | Utilize daylight whenever possible in lieu of artificial light | $1,589 | $794 | |
| UF0409 #10 Y:2007 | 10 | 2007 | Lower light fixtures in high ceiling areas | $2,511 | $406 | |
| UF0409 #09 Y:2007 | 09 | 2007 | Use computer programs to optimize hvac performance | $17,491 | $25,340 | |
| UF0409 #08 Y:2007 | 08 | 2007 | Use most efficient type of electric motors | $3,400 | $10,830 | |
| UF0409 #07 Y:2007 | 07 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $22,082 | $24,230 | |
| UF0409 #06 Y:2007 | 06 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $48,158 | $1,870 | |
| UF0409 #05 Y:2007 | 05 | 2007 | Insulate bare equipment | $764 | $2,390 | |
| UF0409 #04 Y:2007 | 04 | 2007 | Re-size charging openings or add movable cover or door | $2,156 | $20,960 | |
| UF0409 #03 Y:2007 | 03 | 2007 | Close holes and openings in building such as broken windows | $349 | $29 | |
| UF0409 #02 Y:2007 | 02 | 2007 | Install timers and/or thermostats | $8,549 | $1,248 | |
| UF0409 #01 Y:2007 | 01 | 2007 | Improve air circulation with destratification fans / other methods | $11,798 | $16,755 | |
| UF0116 #08 Y:1995 | 08 | 1995 | Use other waste concentration methods | $447 | $4,450 | |
| UF0116 #07 Y:1995 | 07 | 1995 | Use evaporation to concentrate material | $15,571 | $4,450 | |
| UF0116 #06 Y:1995 | 06 | 1995 | Turn off equipment when not in use | $50,619 | $1,000,000 | |
| UF0116 #05 Y:1995 | 05 | 1995 | Purchase gas directly from a contract gas supplier | $75,971 | - | |
| UF0116 #04 Y:1995 | 04 | 1995 | Insulate glazing, walls, ceilings, and roofs | $6,646 | $11,136 |