Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Book printing
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0409 #15 Y:2007 Reuse / recycle/ sell paper products $46,911 -
UF0409 #14 Y:2007 Install back-up equipment $76,789 $12,000
UF0409 #13 Y:2007 Install occupancy sensors $1,180 $162
UF0409 #12 Y:2007 Utilize higher efficiency lamps and/or ballasts $8,401 $10,282
UF0409 #11 Y:2007 Utilize daylight whenever possible in lieu of artificial light $1,589 $794
UF0409 #10 Y:2007 Lower light fixtures in high ceiling areas $2,511 $406
UF0409 #09 Y:2007 Use computer programs to optimize hvac performance $17,491 $25,340
UF0409 #08 Y:2007 Use most efficient type of electric motors $3,400 $10,830
UF0409 #07 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $22,082 $24,230
UF0409 #06 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $48,158 $1,870
UF0409 #05 Y:2007 Insulate bare equipment $764 $2,390
UF0409 #04 Y:2007 Re-size charging openings or add movable cover or door $2,156 $20,960
UF0409 #03 Y:2007 Close holes and openings in building such as broken windows $349 $29
UF0409 #02 Y:2007 Install timers and/or thermostats $8,549 $1,248
UF0409 #01 Y:2007 Improve air circulation with destratification fans / other methods $11,798 $16,755
UF0116 #08 Y:1995 Use other waste concentration methods $447 $4,450
UF0116 #07 Y:1995 Use evaporation to concentrate material $15,571 $4,450
UF0116 #06 Y:1995 Turn off equipment when not in use $50,619 $1,000,000
UF0116 #05 Y:1995 Purchase gas directly from a contract gas supplier $75,971 -
UF0116 #04 Y:1995 Insulate glazing, walls, ceilings, and roofs $6,646 $11,136