ITAC Assessment: UF0116
ITAC logo
ITAC Assessment: UF0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product magazines
NAICS
n/a
SIC 2732: Book Printing
Sales Range $50
M
to 100
M
# of Employees 273
Plant Area 220,800
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,320,630 24,078,840
kWh
Natural Gas $537,927 109,468
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $226,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,920

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $44,689 $49,876 $44,689
808,910
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,231 $350 $25,231
504,689
kWh
- - -
03 2.7135: Install occupancy sensors $7,428 $960 $7,428
200,762
kWh
- - -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $6,646 $11,136 $6,646
139,801
kWh
- - -
05 2.8113: Purchase gas directly from a contract gas supplier $75,971 - - - - $75,971
06 2.6218: Turn off equipment when not in use $50,619 $1,000,000 - $50,619
-
MMBtu
- -
07 3.3131: Use evaporation to concentrate material $15,571 $4,450 $(-120.0)
(-2,345)
kWh
- $15,691
-
gal
-
08 3.3133: Use other waste concentration methods $447 $4,450 $(-120.0)
(-2,345)
kWh
- $567
-
gal
-
TOTAL RECOMMENDED $226,602 $1,071,222 $83,754
1,649,472
kWh
$50,619
-
MMBtu
$16,258
-
gal
$75,971
TOTAL IMPLEMENTED $69,920 $50,226 $69,920
1,313,599
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs