20
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Newspapers: publishing, or publishing and printing | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DL0106 #05 Y:2013 | 05 | 2013 | Improve air circulation with destratification fans / other methods | $81,500 | $11,200 | |
| DL0106 #04 Y:2013 | 04 | 2013 | Replace existing chiller with high efficiency model | $102,000 | $2,375,000 | |
| DL0106 #03 Y:2013 | 03 | 2013 | Install spectral reflectors / delamp | $58,740 | $5,580 | |
| DL0106 #02 Y:2013 | 02 | 2013 | Turn off equipment when not in use | $28,083 | $1,516 | |
| DL0106 #01 Y:2013 | 01 | 2013 | Reduce ventilation air | $50,820 | $2,200 | |
| HO0183 #09 Y:1998 | 09 | 1998 | Employ modular jigs to reduce process set-up time | $5,840 | $800 | |
| HO0183 #08 Y:1998 | 08 | 1998 | Train operators for maximum operating efficiency | $11,680 | - | |
| HO0183 #07 Y:1998 | 07 | 1998 | Install back-up equipment | $3,040 | $8,000 | |
| HO0183 #06 Y:1998 | 06 | 1998 | Lower temperature during the winter season and vice-versa | $1,620 | $3,000 | |
| HO0183 #05 Y:1998 | 05 | 1998 | Use plant owned transformers or lease transformers | $6,570 | $27,500 | |
| HO0183 #04 Y:1998 | 04 | 1998 | Install compressor air intakes in coolest locations | $225 | $250 | |
| HO0183 #03 Y:1998 | 03 | 1998 | Use most efficient type of electric motors | $297 | $552 | |
| HO0183 #02 Y:1998 | 02 | 1998 | Add area lighting switches | $621 | $500 | |
| HO0183 #01 Y:1998 | 01 | 1998 | Utilize higher efficiency lamps and/or ballasts | $3,829 | $7,483 | |
| ST0007 #06 Y:1984 | 06 | 1984 | Recover and reuse cooling water | $8,544 | $2,000 | |
| ST0007 #05 Y:1984 | 05 | 1984 | Keep doors and windows shut when not on use | $2,694 | $50 | |
| ST0007 #04 Y:1984 | 04 | 1984 | Install timers and/or thermostats | $5,741 | $1,000 | |
| ST0007 #03 Y:1984 | 03 | 1984 | Recover waste heat from equipment | $4,307 | $590 | |
| ST0007 #02 Y:1984 | 02 | 1984 | Install automatic stack damper | $1,034 | $130 | |
| ST0007 #01 Y:1984 | 01 | 1984 | Utilize higher efficiency lamps and/or ballasts | $7,031 | $1,461 |