ITAC Assessment: HO0183
ITAC logo
ITAC Assessment: HO0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product newspapers
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 25,000
ft2
Annual Production 335,000
lb
Production Hrs. Annual 3,016
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,047 796,600
kWh
Electricity Demand $23,011 2,574
kW-mo/yr
Electricity Fees $3,171 -
Natural Gas $7,592 1,042
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,722 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,466

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,829 $7,483 $2,971
35,170
kWh
$858
-
kW-mo/yr
- -
02 2.7131: Add area lighting switches $621 $500 $621
7,327
kWh
- - -
03 2.4133: Use most efficient type of electric motors $297 $552 $297
3,517
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $225 $250 - $225
-
kW-mo/yr
- -
05 2.3511: Use plant owned transformers or lease transformers $6,570 $27,500 - - $6,570 -
06 2.7221: Lower temperature during the winter season and vice-versa $1,620 $3,000 $1,620
19,343
kWh
- - -
07 4.651: Install back-up equipment $3,040 $8,000 - - - $3,040
08 4.431: Train operators for maximum operating efficiency $11,680 - - - - $11,680
09 4.623: Employ modular jigs to reduce process set-up time $5,840 $800 - - - $5,840
TOTAL RECOMMENDED $33,722 $48,085 $5,509
65,357
kWh
$1,083
-
kW-mo/yr
$6,570 $20,560
TOTAL IMPLEMENTED $2,466 $3,750 $2,241
26,670
kWh
$225
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs