Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,787

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Printing, publishing, and allied industries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CI0092 #09 Y:2026 Reduce the pressure of compressed air to the minimum required $585 -
CI0092 #08 Y:2026 Turn off equipment during breaks, reduce operating time $1,364 $2,000
CI0092 #07 Y:2026 Use photocell controls $1,530 $930
CI0092 #06 Y:2026 Upgrade obsolete equipment $1,647 $25,000
CI0092 #05 Y:2026 Reschedule plant operations or reduce load to avoid peaks $2,629 $1,000
CI0092 #04 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $3,149 $19,000
CI0092 #03 Y:2026 Use solar heat to make electricty $12,136 $56,000
CI0092 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $15,811 $4,500
CI0092 #01 Y:2026 Replace old machine with new automatic multi-station tool $27,870 $90,000
UL2612 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,850 $1,313
UL2612 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,267 $1,575
UL2612 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $19,848 $7,349
UL2612 #02 Y:2026 Change rate schedules or other changes in utility service $66,453 -
UL2612 #01 Y:2026 Optimize plant power factor $9,968 $10,400
UU0306 #08 Y:2026 Install occupancy sensors $5,800 $22,300
UU0306 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,739 $5,440
UU0306 #06 Y:2026 Improve air circulation with destratification fans / other methods $3,850 $12,000
UU0306 #05 Y:2026 Eliminate or reduce compressed air usage $540 $2,160
UU0306 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,907 $950
UU0306 #03 Y:2026 Use / purchase optimum sized compressor $10,490 $100,000