Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Folding paperboard boxes, including sanitary
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0810 #05 Y:2011 Recharge batteries on during off-peak demand periods $2,915 -
OK0810 #04 Y:2011 Make a practice of turning off lights when not needed $5,317 -
OK0810 #03 Y:2011 Utilize higher efficiency lamps and/or ballasts $3,360 $14,062
OK0810 #02 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $44,840 $11,400
OK0810 #01 Y:2011 Use direct flame impingement or infrared processing for chamber type heating $41,808 $12,400
OK0808 #06 Y:2011 Install outside air damper / economizer on hvac unit $27,934 $5,125
OK0808 #05 Y:2011 Use / purchase optimum sized compressor $23,465 $16,400
OK0808 #04 Y:2011 Utilize higher efficiency lamps and/or ballasts $1,907 $5,105
OK0808 #03 Y:2011 Utilize higher efficiency lamps and/or ballasts $8,547 $17,879
OK0808 #02 Y:2011 Use power during off-peak periods $19,801 $226
OK0808 #01 Y:2011 Lower temperature during the winter season and vice-versa $11,989 $1,776
AR0189 #05 Y:2000 Re-arrange equipment layout to reduce labor costs $2,249 $110
AR0189 #04 Y:2000 Install equipment to move product $269,892 $15,800
AR0189 #03 Y:2000 Sell oil to recycler $1,436 $1,500
AR0189 #02 Y:2000 Utilize higher efficiency lamps and/or ballasts $3,227 $5,679
AR0189 #01 Y:2000 Use synthetic lubricant $2,906 -