ITAC Assessment: OK0810
ITAC logo
ITAC Assessment: OK0810
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Paperboard boxes
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $100
M
to 500
M
# of Employees 285
Plant Area 350,000
ft2
Annual Production 150,000,000
pieces
Production Hrs. Annual 8,640
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $662,120 12,064,816
kWh
Natural Gas $103,209 10,666
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,157

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.5113: Use direct flame impingement or infrared processing for chamber type heating $41,808 $12,400 - - $41,808
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $44,840 $11,400 $44,840
815,237
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,360 $14,062 $3,360
80,015
kWh
- -
04 2.7124: Make a practice of turning off lights when not needed $5,317 - $5,317
126,590
kWh
- -
05 2.3132: Recharge batteries on during off-peak demand periods $2,915 - - $2,915
-
kW-mo/yr
-
TOTAL RECOMMENDED $98,240 $37,862 $53,517
1,021,842
kWh
$2,915
-
kW-mo/yr
$41,808
-
MMBtu
TOTAL IMPLEMENTED $50,157 $11,400 $50,157
941,827
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs