ITAC Assessment: ME0287
ITAC logo
ITAC Assessment: ME0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Auto-reset circuit breakers
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 32,200
ft2
Annual Production 53,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,213 1,947,245
kWh
Electricity Demand $30,024 3,098
kW-mo/yr
LPG $2,758 251
MMBtu
Fuel Oil #2 $5,359 1,426
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,842 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,921

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,421 $18,457 $9,403
156,800
kWh
$2,018
-
kW-mo/yr
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,142 $13,995 $3,113
55,393
kWh
$3,985
-
kW-mo/yr
- $(-956.0)
-
MMBtu
-
03 2.2511: Insulate bare equipment $3,630 $600 $3,630
34,877
kWh
- - - -
04 2.2136: Install / repair insulation on steam lines $2,217 $1,515 $2,217
138,335
kWh
- - - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,778 $800 $1,493
26,377
kWh
$1,515
-
kW-mo/yr
$(-1,230.0)
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $1,450 $1,500 $1,450
25,791
kWh
- - - -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,291 $750 $1,478
26,377
kWh
$1,049
-
kW-mo/yr
$(-1,236.0)
-
MMBtu
- -
08 2.6218: Turn off equipment when not in use $373 $370 $373
6,741
kWh
- - - -
09 3.5217: Reuse / recycle/ sell paper products $540 - - - - - $540
-
lb
TOTAL RECOMMENDED $28,842 $37,987 $23,157
470,691
kWh
$8,567
-
kW-mo/yr
$(-2,466.0)
-
MMBtu
$(-956.0)
-
MMBtu
$540
-
lb
TOTAL IMPLEMENTED $4,921 $1,350 $5,108
61,254
kWh
$1,049
-
kW-mo/yr
$(-1,236.0)
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs