ITAC Assessment: LL0170
ITAC logo
ITAC Assessment: LL0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Ceramic Products
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 125,000
ft2
Annual Production 29,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,014 926,784
kWh
Electricity Demand $10,413 3,554
kW-mo/yr
Electricity Fees $5,121 -
Natural Gas $336,867 65,047
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,722

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.6218: Turn off equipment when not in use $25,860 $15 $22,712
315,749
kWh
$1,524
-
kW-mo/yr
$1,624 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,722 $1,560 $6,300
87,558
kWh
- $422 -
03 2.7111: Reduce illumination to minimum necessary levels $2,374 $255 $2,096
29,139
kWh
$129
-
kW-mo/yr
$149 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,827 $1,200 $1,966
27,331
kWh
$108
-
kW-mo/yr
$139 $1,614
05 2.7135: Install occupancy sensors $632 $140 $571
7,944
kWh
$21
-
kW-mo/yr
$40 -
06 4.611: Begin a practice of predictive / preventative maintenance $6,010 $2,174 - - - $6,010
TOTAL RECOMMENDED $45,425 $5,344 $33,645
467,721
kWh
$1,782
-
kW-mo/yr
$2,374 $7,624
TOTAL IMPLEMENTED $6,722 $1,560 $6,300
87,558
kWh
- $422 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs