33
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Setup paperboard boxes | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0257 #02 Y:2007 | 02 | 2007 | Reduce the pressure of compressed air to the minimum required | $13,241 | $10,000 | |
| LE0257 #01 Y:2007 | 01 | 2007 | Use optimum temperature | $14,693 | $3,500 | |
| LE0229 #11 Y:2005 | 11 | 2005 | Utilize higher efficiency lamps and/or ballasts | $3,100 | $4,218 | |
| LE0229 #10 Y:2005 | 10 | 2005 | Install occupancy sensors | $5,318 | $525 | |
| LE0229 #09 Y:2005 | 09 | 2005 | Install compressor air intakes in coolest locations | $1,780 | $1,000 | |
| LE0229 #08 Y:2005 | 08 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $2,528 | $2,500 | |
| LE0229 #07 Y:2005 | 07 | 2005 | Use / purchase optimum sized compressor | $2,542 | $2,100 | |
| LE0229 #06 Y:2005 | 06 | 2005 | Shift from daytime to nighttime operation | $6,898 | $316 | |
| LE0229 #05 Y:2005 | 05 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,981 | $500 | |
| LE0229 #04 Y:2005 | 04 | 2005 | Install soft-start to eliminate nuisance trips | $16,904 | $34,000 | |
| LE0229 #03 Y:2005 | 03 | 2005 | Recycle waste ink and cleanup solvent | $36,000 | $50,000 | |
| LE0229 #02 Y:2005 | 02 | 2005 | Replace fossil fuel equipment with electrical equipment | $64,670 | $27,200 | |
| LE0229 #01 Y:2005 | 01 | 2005 | Redesign process | $80,430 | $30,000 |