Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,598

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paperboard containers and boxes
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0637 #09 Y:2025 Use solar heat to make electricty $259,385 $1,518,722
SF0637 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $27,397 $47,899
SF0637 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $154,683 $168,414
SF0637 #06 Y:2025 Turn off equipment when not in use $2,986 $2,376
SF0637 #05 Y:2025 Turn off equipment when not in use $32,229 $20,192
SF0637 #04 Y:2025 Utilize energy-efficient belts and other improved mechanisms $749 $311
SF0637 #03 Y:2025 Turn off equipment when not in use $62,779 $13,540
SF0637 #02 Y:2025 Turn off equipment when not in use $71,540 -
SF0637 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $33,495 -
CM1051 #12 Y:2025 Apply for tax-free status for energy purchases $12,476 $8,000
CM1051 #11 Y:2025 Utilize higher efficiency lamps and/or ballasts $13,510 $63,288
CM1051 #10 Y:2025 Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $387 $8,216
CM1051 #09 Y:2025 Install partitions to reduce size of conditioned space $402 $3,500
CM1051 #08 Y:2025 Eliminate or reduce compressed air usage $1,212 $1,051
CM1051 #07 Y:2025 Use most efficient type of electric motors $383 $2,812
CM1051 #06 Y:2025 Use proper thickness of insulation on building envelope $14,825 $19,854
CM1051 #05 Y:2025 Turn off equipment when not in use $494 -
CM1051 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,913 $679
CM1051 #03 Y:2025 Increase efficiency of trucks $41,631 $160,456
CM1051 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $16,537 $68,962