Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paperboard mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0986 #13 Y:2017 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $634,282 $3,891,600
OK0986 #12 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $99,065 $85,003
OK0986 #11 Y:2017 Reduce space conditioning during non-working hours $357 $183
OK0986 #10 Y:2017 Install outside air damper / economizer on hvac unit $546 $1,200
OK0986 #09 Y:2017 Install compressor air intakes in coolest locations $2,714 $381
OK0986 #08 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $14,819 $4,198
OK0986 #07 Y:2017 Utilize higher efficiency lamps and/or ballasts $2,208 $4,556
OK0986 #06 Y:2017 Utilize higher efficiency lamps and/or ballasts $893 $6,038
OK0986 #05 Y:2017 Utilize higher efficiency lamps and/or ballasts $552 $1,402
OK0986 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $8,941 $16,934
OK0986 #03 Y:2017 Use insulation in furnaces to facilitate heating / cooling $698 $356
OK0986 #02 Y:2017 Analyze flue gas for proper air/fuel ratio $28,456 $4,000
OK0986 #01 Y:2017 Repair and eliminate steam leaks $107,913 $4,800
KU0344 #08 Y:1991 Utilize energy-efficient belts and other improved mechanisms $8,696 $5,700
KU0344 #07 Y:1991 Use most efficient type of electric motors $1,036 $973
KU0344 #06 Y:1991 Insulate bare equipment $16,731 $15,811
KU0344 #05 Y:1991 Install compressor air intakes in coolest locations $3,057 $1,200
KU0344 #04 Y:1991 Use separate switches on perimeter lighting which may be turned off when natural light is available $385 $285
KU0344 #03 Y:1991 Optimize plant power factor $9,087 $19,000
KU0344 #02 Y:1991 Insulate bare equipment $13,421 $150,000