ITAC Assessment: KU0344
ITAC logo
ITAC Assessment: KU0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product RECYCED PAPERBOARD
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area
n/a
Annual Production 70,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $773,339 18,606,096
kWh
Natural Gas $1,566,037 941,645
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,517 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1243: Use heat from boiler blowdown to preheat boiler feed water $9,104 $9,500 - $9,104
-
MMBtu
02 2.2511: Insulate bare equipment $13,421 $150,000 - $13,421
-
MMBtu
03 2.3212: Optimize plant power factor $9,087 $19,000 $9,087
-
kWh
-
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $385 $285 $385
9,379
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $3,057 $1,200 $3,057
73,564
kWh
-
06 2.2511: Insulate bare equipment $16,731 $15,811 - $16,731
-
MMBtu
07 2.4133: Use most efficient type of electric motors $1,036 $973 $1,036
24,619
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,696 $5,700 $8,696
209,261
kWh
-
TOTAL RECOMMENDED $61,517 $202,469 $22,261
316,823
kWh
$39,256
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs