Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paperboard mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0401 #14 Y:2009 Eliminate or reduce compressed air usage $536 $52
WV0401 #13 Y:2009 Utilize energy-efficient belts and other improved mechanisms $1,239 $1,000
WV0401 #12 Y:2009 Utilize higher efficiency lamps and/or ballasts $3,182 $2,886
WV0401 #11 Y:2009 Install compressor air intakes in coolest locations $3,378 $936
WV0401 #10 Y:2009 Improve lubrication practices $3,683 $858
WV0401 #09 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $5,622 $312
WV0401 #08 Y:2009 Install vinyl strip / high speed / air curtain doors $6,432 $2,028
WV0401 #07 Y:2009 Install dry sprinkler system or other method to reduce heating requirements $7,432 $16,240
WV0401 #06 Y:2009 Recycle air for heating, ventilation and air conditioning $11,226 $20,400
WV0401 #05 Y:2009 Utilize higher efficiency lamps and/or ballasts $15,792 $7,958
WV0401 #04 Y:2009 Develop a repair/replace policy $19,593 $1,638
WV0401 #03 Y:2009 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $38,419 $128,000
WV0401 #02 Y:2009 Utilize controls to operate equipment only when needed $57,379 $6,240
WV0401 #01 Y:2009 Recover waste heat from equipment $61,713 $37,440
OD0057 #06 Y:1996 Meter recycled water (to reduce sewer charges) $751 $200
OD0057 #05 Y:1996 Use waste heat from hot flue gases to preheat $3,639 $4,232
OD0057 #04 Y:1996 Utilize higher efficiency lamps and/or ballasts $2,768 $430
OD0057 #03 Y:1996 Recover waste heat from equipment $1,630 $1,950
OD0057 #02 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $1,120 $600
OD0057 #01 Y:1996 Analyze flue gas for proper air/fuel ratio $6,833 $500