Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paper mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0894 #09 Y:2013 Install motor voltage controller on lightly loaded motors $10,400 $40,600
UD0894 #08 Y:2013 Install motor voltage controller on lightly loaded motors $12,240 $30,550
UD0894 #07 Y:2013 Insulate bare equipment $142 $350
UD0894 #06 Y:2013 Analyze flue gas for proper air/fuel ratio $5,426 -
UD0894 #05 Y:2013 Use waste heat from hot flue gases to preheat $9,638 $10,000
UD0894 #04 Y:2013 Optimize plant power factor $17,944 $8,000
UD0894 #03 Y:2013 Reduce the pressure of compressed air to the minimum required $3,290 -
UD0894 #02 Y:2013 Utilize energy-efficient belts and other improved mechanisms $7,885 -
UD0894 #01 Y:2013 Use minimum cooling water to bearings $17,378 -
UD0539 #04 Y:1997 Increase amount of condensate returned $8,880 $15,000
UD0539 #03 Y:1997 Reschedule plant operations or reduce load to avoid peaks $39,482 -
UD0539 #02 Y:1997 Change rate schedules or other changes in utility service $1,296 -
UD0539 #01 Y:1997 Use flow control valves on equipment to optimize water use $2,210 $3,000
UD0502 #05 Y:1996 Use less wasteful packaging $48,400 -
UD0502 #04 Y:1996 Use / purchase optimum sized compressor $19,538 $500
UD0502 #03 Y:1996 Minimize water usage $48,400 $150
UD0502 #02 Y:1996 Optimize plant power factor $29,345 $93,000
UD0502 #01 Y:1996 Use a less expensive method of waste removal $372,300 $800,000
UD0500 #10 Y:1996 Optimize production lot sizes and inventories $29,297 -
UD0500 #09 Y:1996 Insulate bare equipment $628 $2,040