ITAC Assessment: BD0326
ITAC logo
ITAC Assessment: BD0326
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product paperboard
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range less than $500
k
# of Employees 48
Plant Area 53,125
ft2
Annual Production 1
units
Production Hrs. Annual 8,712
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $802,718 19,095,675
kWh
Natural Gas $99,865 252,295
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,568 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $668 $450 $667
15,874
kWh
$1
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $460 $650 $459
7,323
kWh
$1
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,449 $4,115 $5,448
129,722
kWh
$1
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $7,742 $42,500 $7,741
184,301
kWh
$1
-
kW-mo/yr
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,075 $20,500 $9,074
216,040
kWh
$1
-
kW-mo/yr
- - -
06 2.2437: Recover waste heat from equipment $9,125 $1,200 $9,125
714
kWh
- - - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $14,867 $5,500 - - - $14,867
-
lb
-
08 4.454: Modify startup/shutdown times $2,400 $7,000 - - - - $2,400
09 3.5311: Recover and reuse waste material $512 - - - - $512
-
lb
-
10 2.2135: Repair and eliminate steam leaks $270 $150 - - $270
-
MMBtu
- -
TOTAL RECOMMENDED $50,568 $82,065 $32,514
553,974
kWh
$5
-
kW-mo/yr
$270
-
MMBtu
$15,379
-
lb
$2,400
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs