ITAC Assessment: KU0339
ITAC logo
ITAC Assessment: KU0339
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SANDERS & GRINDERS
NAICS
n/a
SIC 3546: Power-Driven Handtools
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 200
pieces
Production Hrs. Annual 4,032
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,235 1,175,850
kWh
Natural Gas $13,869 3,175
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,675 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,675

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $4,004 $700 $2,562
46,893
kWh
$1,442
-
MMBtu
-
02 2.7221: Lower temperature during the winter season and vice-versa $1,315 $1,860 - $1,315
-
MMBtu
-
03 2.7211: Clean and maintain refrigerant condensers and towers $1,071 - $720
13,189
kWh
- $351
04 2.2692: Use outside cold water source as a supply of cooling water $1,066 $525 $192
3,517
kWh
$874
-
MMBtu
-
05 2.6212: Turn off equipment during breaks, reduce operating time $577 $350 $96
1,758
kWh
$481
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $83 $119 $83
1,465
kWh
- -
07 2.7224: Reduce space conditioning during non-working hours $415 - - $415
-
MMBtu
-
08 2.6218: Turn off equipment when not in use $144 - $144
7,620
kWh
- -
TOTAL RECOMMENDED $8,675 $3,554 $3,797
74,442
kWh
$4,527
-
MMBtu
$351
TOTAL IMPLEMENTED $8,675 $3,554 $3,797
74,442
kWh
$4,527
-
MMBtu
$351
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs