Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Furniture and fixtures, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1086 #04 Y:2022 Use solar heat to make electricty $31,948 $382,200
OK1086 #03 Y:2022 Use radiant heater for spot heating $8,472 $13,560
OK1086 #02 Y:2022 Install compressor air intakes in coolest locations $630 $330
OK1086 #01 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $3,012 $1,489
UF0559 #08 Y:2021 Eliminate old stock and modify inventory control $5,262 $7,180
UF0559 #07 Y:2021 Reduce the pressure of compressed air to the minimum required $602 -
UF0559 #06 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,328 $5,468
UF0559 #05 Y:2021 Use most efficient type of electric motors $2,600 $3,317
UF0559 #04 Y:2021 Reposition oven walls to reduce heated space $3,003 $750
UF0559 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $3,767 $956
UF0559 #02 Y:2021 Clean or color roof to reduce solar load $19,566 $32,210
UF0559 #01 Y:2021 Use solar heat to make electricty $42,076 $359,360
UD0919 #13 Y:2014 Clean fouling from water lines regularly $5,080 $2,750
UD0919 #12 Y:2014 Make a new by-product $24,789 $46,000
UD0919 #11 Y:2014 Utilize daylight whenever possible in lieu of artificial light $242 $700
UD0919 #10 Y:2014 Use waste heat from flue gases to heat space conditioning air $2,652 $5,000
UD0919 #09 Y:2014 Install motor voltage controller on lightly loaded motors $4,591 $4,300
UD0919 #08 Y:2014 Reduce the pressure of compressed air to the minimum required $1,715 -
UD0919 #07 Y:2014 Turn off equipment during breaks, reduce operating time $11,674 -
UD0919 #06 Y:2014 Install compressor air intakes in coolest locations $3,496 $2,295