Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drapery hardware and window blinds and shades
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0393 #13 Y:2009 Utilize energy-efficient belts and other improved mechanisms $370 -
WV0393 #12 Y:2009 Reduce the pressure of compressed air to the minimum required $419 $20
WV0393 #11 Y:2009 Install vinyl strip / high speed / air curtain doors $554 $56
WV0393 #10 Y:2009 Install compressor air intakes in coolest locations $764 $220
WV0393 #09 Y:2009 Eliminate or reduce compressed air usage $1,723 $2,067
WV0393 #08 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $2,009 $500
WV0393 #07 Y:2009 Re-use or recycle hot or cold process exhaust air $2,298 $3,800
WV0393 #06 Y:2009 Recover waste heat from equipment $2,691 $2,450
WV0393 #05 Y:2009 Use demand controller or load shedder $4,441 $7,800
WV0393 #04 Y:2009 Utilize a less expensive cooling method $5,419 $4,400
WV0393 #03 Y:2009 Change rate schedules or other changes in utility service $8,129 $2,000
WV0393 #02 Y:2009 Install outside air damper / economizer on hvac unit $45,591 $127,000
WV0393 #01 Y:2009 Utilize higher efficiency lamps and/or ballasts $69,642 $143,500
MS0311 #07 Y:2006 Recover waste heat from equipment $385 $476
MS0311 #06 Y:2006 Burn waste oil for heat $1,265 $2,186
MS0311 #05 Y:2006 Utilize energy-efficient belts and other improved mechanisms $2,304 $2,700
MS0311 #04 Y:2006 Shut off pilots in standby equipment $1,669 $185
MS0311 #03 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $2,166 $176
MS0311 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $4,986 $23,207
MS0311 #01 Y:2006 Utilize higher efficiency lamps and/or ballasts $29,634 $62,998