Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Venetian Blind Components
NAICS 337920: Blind and Shade Manufacturing
SIC 2591: Drapery Hardware and Window Blinds and Shades
Sales Range $10
M
to 50
M
# of Employees 163
Plant Area 300,000
ft2
Annual Production 240,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $303,195 4,487,312
kWh
Electricity Demand $106,572 9,689
kW-mo/yr
Electricity Fees $1,458 -
Natural Gas $328,659 26,351
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,409 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,470

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $29,634 $62,998 $18,924
441,112
kWh
$10,710
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,986 $23,207 $2,801
65,302
kWh
$2,185
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,166 $176 $2,166
50,474
kWh
- -
04 2.6214: Shut off pilots in standby equipment $1,669 $185 - - $1,669
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,304 $2,700 $1,318
30,713
kWh
$986
-
kW-mo/yr
-
06 3.6124: Burn waste oil for heat $1,265 $2,186 - - $1,265
-
MMBtu
07 2.2437: Recover waste heat from equipment $385 $476 - - $385
-
MMBtu
TOTAL RECOMMENDED $42,409 $91,928 $25,209
587,601
kWh
$13,881
-
kW-mo/yr
$3,319
-
MMBtu
TOTAL IMPLEMENTED $4,470 $2,876 $3,484
81,187
kWh
$986
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings