Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

293

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous furniture and fixtures
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0621 #09 Y:2026 Install compressor air intakes in coolest locations $224 $1,573
AS0621 #08 Y:2026 Conserve energy by efficient use of vending machines $1,381 $547
AS0621 #07 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,673 $516
AS0621 #06 Y:2026 Install timers and/or thermostats $1,823 $1,826
AS0621 #05 Y:2026 Turn off equipment when not in use $1,828 $62
AS0621 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $2,939 $11,910
AS0621 #03 Y:2026 Utilize controls to operate equipment only when needed $3,915 $2,204
AS0621 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $5,397 $7,852
AS0621 #01 Y:2026 Upgrade obsolete equipment $81,446 $350,000
MU0076 #11 Y:2025 Install occupancy sensors $176 $647
MU0076 #10 Y:2025 Use or replace with energy efficient substitutes $412 $3,346
MU0076 #09 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $440 $230
MU0076 #08 Y:2025 Use or replace with energy efficient substitutes $139 -
MU0076 #07 Y:2025 Insulate bare equipment $1,132 $5,482
MU0076 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,713 -
MU0076 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $8,912 $14,934
MU0076 #04 Y:2025 Replace fossil fuel equipment with electrical equipment $12,567 $104,537
MU0076 #03 Y:2025 Insulate glazing, walls, ceilings, and roofs $25,377 $56,072
MU0076 #02 Y:2025 Change procedures / equipment / operating conditions $25,719 $59,150
MU0076 #01 Y:2025 Use solar heat to make electricty $33,420 $529,760