Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Office and store fixtures, partitions, shelving, and lockers, except wood
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0264 #11 Y:2000 Pay bills on time to avoid late fees $4,784 -
UF0264 #10 Y:2000 Install equipment (eg compactor) to reduce disposal costs $700 $1,895
UF0264 #09 Y:2000 Meter recycled water (to reduce sewer charges) $5,640 $1,018
UF0264 #08 Y:2000 Contract a wood pallet recycling company $2,515 -
UF0264 #07 Y:2000 Use most efficient type of electric motors $16,668 $60,448
UF0264 #06 Y:2000 Apply for tax-free status for energy purchases $51,429 $50
UF0264 #05 Y:2000 Disconnect ballasts $4,531 $22
UF0264 #04 Y:2000 Change rate schedules or other changes in utility service $35,535 $1,000
UF0264 #03 Y:2000 Install occupancy sensors $6,067 $3,080
UF0264 #02 Y:2000 Utilize higher efficiency lamps and/or ballasts $945 $886
UF0264 #01 Y:2000 Utilize higher efficiency lamps and/or ballasts $7,935 $2,079
KU0551 #05 Y:2000 Recover and reuse waste material $26,760 $37,200
KU0551 #04 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $827 $700
KU0551 #03 Y:2000 Install compressor air intakes in coolest locations $1,370 $890
KU0551 #02 Y:2000 Reduce the pressure of compressed air to the minimum required $2,010 $60
KU0551 #01 Y:2000 Preheat combustion air with waste heat $8,821 $18,000