ITAC Assessment: KU0551
ITAC logo
ITAC Assessment: KU0551
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product wire racks
NAICS
n/a
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $10
M
to 50
M
# of Employees 480
Plant Area 300,000
ft2
Annual Production 13,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,624 4,170,160
kWh
Electricity Fees $8,758 -
Natural Gas $143,109 37,893
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2442: Preheat combustion air with waste heat $8,821 $18,000 - $8,821
-
MMBtu
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,010 $60 $2,010
47,479
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $1,370 $890 $1,370
32,532
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $827 $700 $827
19,637
kWh
- - -
05 3.5311: Recover and reuse waste material $26,760 $37,200 - - $37,560
-
lb
$(-10,800.0)
TOTAL RECOMMENDED $39,788 $56,850 $4,207
99,648
kWh
$8,821
-
MMBtu
$37,560
-
lb
$(-10,800.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs