Assessment Year | 2000 |
---|---|
Principal Product | wire racks |
NAICS |
n/a
|
SIC | 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood |
Sales Range | $10 M to 50M |
# of Employees | 480 |
Plant Area |
300,000
ft2
|
Annual Production | 13,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $167,624 | 4,170,160 |
kWh
|
$0.040 |
Electricity Fees | $8,758 | - |
|
- |
Natural Gas | $143,109 | 37,893 |
MMBtu
|
$3.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,788 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2442: Preheat combustion air with waste heat | $8,821 | $18,000 | - |
$8,821
-
MMBtu
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,010 | $60 |
$2,010
47,479
kWh
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,370 | $890 |
$1,370
32,532
kWh
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $827 | $700 |
$827
19,637
kWh
|
- | - | - | |
05 | 3.5311: Recover and reuse waste material | $26,760 | $37,200 | - | - |
$37,560
-
lb
|
$(-10,800.0) | |
TOTAL RECOMMENDED | $39,788 | $56,850 |
$4,207
99,648
kWh
|
$8,821
-
MMBtu
|
$37,560
-
lb
|
$(-10,800.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs