| Assessment Year | 1999 |
|---|---|
| Principal Product | Dry dog, cat, and horse feed |
| NAICS |
n/a
|
| SIC | 2047: Dog and Cat Food |
| Sales Range | $50 M to 100M |
| # of Employees | 75 |
| Plant Area |
211,800
ft2
|
| Annual Production | 140,000
ton
|
| Production Hrs. Annual | 8,688
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $270,390 | 8,271,981 |
kWh
|
$0.033 |
| Electricity Demand | $125,272 | 14,973 |
kW-mo/yr
|
$8.37 |
| Natural Gas | $292,354 | 121,040 |
MMBtu
|
$2.42 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,145 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $13,450 | $5,500 | - | - | - | - |
$13,450
-
lb
|
- | |
| 02 | 2.2135: Repair and eliminate steam leaks | $2,575 | $1,500 | - | - |
$2,575
-
MMBtu
|
- | - | - | |
| 03 | 2.4314: Use synthetic lubricant | $2,120 | - |
$1,280
49,238
kWh
|
$840
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,030 | $500 | - | - |
$2,030
-
MMBtu
|
- | - | - | |
| 05 | 3.4154: Eliminate leaks in water lines and valves | $830 | $64 | - | - | - |
$830
-
Tgal
|
- | - | |
| 06 | 2.2511: Insulate bare equipment | $500 | $212 | - | - |
$500
-
MMBtu
|
- | - | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $500 | - |
$500
19,343
kWh
|
- | - | - | - | - | |
| 08 | 2.2511: Insulate bare equipment | $240 | $1,360 | - | - |
$240
-
MMBtu
|
- | - | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $125 | $180 |
$30
1,172
kWh
|
$25
-
kW-mo/yr
|
- | - | - | $70 | |
| TOTAL RECOMMENDED | $22,370 | $9,316 |
$1,810
69,753
kWh
|
$865
-
kW-mo/yr
|
$5,345
-
MMBtu
|
$830
-
Tgal
|
$13,450
-
lb
|
$70 | ||
| TOTAL IMPLEMENTED | $4,145 | $2,924 |
$500
19,343
kWh
|
- |
$2,815
-
MMBtu
|
$830
-
Tgal
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs