ITAC Assessment: SF0425
ITAC logo
ITAC Assessment: SF0425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Polyethylene Foam
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 59
Plant Area 277,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 6,048
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $561,783 6,455,930
kWh
Electricity Demand $289,147 17,316
kW-mo/yr
Electricity Fees $16,667 -
Natural Gas $79,529 10,064
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,183 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,050

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $6,713 - $6,713
77,351
kWh
- - -
02 2.4226: Use / purchase optimum sized compressor $15,421 $7,471 $15,421
175,187
kWh
- - -
03 2.7224: Reduce space conditioning during non-working hours $4,974 $5,906 $2,648
30,432
kWh
- - $2,326
-
MMBtu
04 2.4131: Size electric motors for peak operating efficiency $1,255 $2,240 $1,255
14,425
kWh
- - -
05 2.4131: Size electric motors for peak operating efficiency $30,904 $9,885 $30,904
44,862
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,808 $7,235 $1,808
16,860
kWh
- - -
07 2.7135: Install occupancy sensors $3,416 $13,849 $2,344
26,931
kWh
$1,072
-
kW-mo/yr
- -
08 2.3111: Heat water during off-peak periods and store for later use $692 $2,830 - - $692 -
TOTAL RECOMMENDED $65,183 $49,416 $61,093
386,048
kWh
$1,072
-
kW-mo/yr
$692 $2,326
-
MMBtu
TOTAL IMPLEMENTED $28,050 $31,385 $26,286
296,329
kWh
$1,072
-
kW-mo/yr
$692 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs