ITAC Assessment: UF0264
ITAC logo
ITAC Assessment: UF0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Vinyl coated steel wire closet storage units
NAICS
n/a
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $100
M
to 500
M
# of Employees 800
Plant Area 600,000
ft2
Annual Production 100,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $782,188 16,596,425
kWh
Electricity Demand $262,080 44,047
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,749 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $125,878

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,935 $2,079 $5,555
118,113
kWh
$2,380
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $945 $886 $247
5,275
kWh
$43
-
kW-mo/yr
- - $655 -
03 2.7135: Install occupancy sensors $6,067 $3,080 $6,067
128,957
kWh
- - - - -
04 2.8114: Change rate schedules or other changes in utility service $35,535 $1,000 - - - - - $35,535
05 2.7122: Disconnect ballasts $4,531 $22 $3,860
82,063
kWh
$671
-
kW-mo/yr
- - - -
06 2.8121: Apply for tax-free status for energy purchases $51,429 $50 - - - - $51,429 -
07 2.4133: Use most efficient type of electric motors $16,668 $60,448 $14,203
302,169
kWh
$2,465
-
kW-mo/yr
- - - -
08 3.5316: Contract a wood pallet recycling company $2,515 - - - - $2,515
-
lb
- -
09 3.4116: Meter recycled water (to reduce sewer charges) $5,640 $1,018 - - $5,640
-
Tgal
- - -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $700 $1,895 - - - $700
-
lb
- -
11 4.821: Pay bills on time to avoid late fees $4,784 - - - - - $4,784 -
TOTAL RECOMMENDED $136,749 $70,478 $29,932
636,577
kWh
$5,559
-
kW-mo/yr
$5,640
-
Tgal
$3,215
-
lb
$56,868 $35,535
TOTAL IMPLEMENTED $125,878 $67,543 $26,072
554,514
kWh
$4,888
-
kW-mo/yr
- $2,515
-
lb
$56,868 $35,535
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs