371
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Public building and related furniture | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UC2506 #08 Y:2025 | 08 | 2025 | Install timers and/or thermostats | $8,437 | $1,150 |
n/a
|
UC2506 #07 Y:2025 | 07 | 2025 | Modify startup/shutdown times | $18,810 | - |
n/a
|
UC2506 #06 Y:2025 | 06 | 2025 | Install partitions to reduce size of conditioned space | $136 | $557 |
n/a
|
UC2506 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,755 | $1,600 |
n/a
|
UC2506 #04 Y:2025 | 04 | 2025 | Reduce the pressure of compressed air to the minimum required | $3,873 | $75 |
n/a
|
UC2506 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $10,373 | $6,979 |
n/a
|
UC2506 #02 Y:2025 | 02 | 2025 | Install occupancy sensors | $1,938 | $3,780 |
n/a
|
UC2506 #01 Y:2025 | 01 | 2025 | Change rate schedules or other changes in utility service | $26,750 | - |
n/a
|
UU0213 #05 Y:2022 | 05 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $639 | $1,950 | |
UU0213 #04 Y:2022 | 04 | 2022 | Optimize plant power factor | $1,190 | $3,000 | |
UU0213 #03 Y:2022 | 03 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,602 | $1,773 | |
UU0213 #02 Y:2022 | 02 | 2022 | Install occupancy sensors | $5,181 | $18,250 | |
UU0213 #01 Y:2022 | 01 | 2022 | Use power during off-peak periods | $7,487 | $8,000 | |
UU0212 #07 Y:2022 | 07 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $382 | $1,370 | |
UU0212 #06 Y:2022 | 06 | 2022 | Use hot process fluids to preheat incoming process fluids | $425 | $850 | |
UU0212 #05 Y:2022 | 05 | 2022 | Use optimum thickness insulation | $4,220 | $4,402 | |
UU0212 #04 Y:2022 | 04 | 2022 | Optimize plant power factor | $4,400 | $9,000 | |
UU0212 #03 Y:2022 | 03 | 2022 | Utilize higher efficiency lamps and/or ballasts | $8,326 | $21,555 | |
UU0212 #02 Y:2022 | 02 | 2022 | Replace boiler | $11,580 | $80,000 | |
UU0212 #01 Y:2022 | 01 | 2022 | Reschedule plant operations or reduce load to avoid peaks | $15,149 | $8,500 |