Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

642

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Office furniture
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0578 #18 Y:2025 Use cooling tower or economizer to replace chiller cooling $4,025 $15,784
SU0578 #17 Y:2025 Install / repair insulation on steam lines $1,185 $2,822
SU0578 #16 Y:2025 Install occupancy sensors $574 $1,355
SU0578 #15 Y:2025 Conserve energy by efficient use of vending machines $350 $745
SU0578 #14 Y:2025 Use or replace with energy efficient substitutes $1,163 $2,080
SU0578 #13 Y:2025 Insulate bare equipment $294 $445
SU0578 #12 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $53,073 $79,597
SU0578 #11 Y:2025 Utilize higher efficiency lamps and/or ballasts $16,627 $14,880
SU0578 #10 Y:2025 Turn off equipment when not in use $5,324 $2,320
SU0578 #09 Y:2025 Reduce ventilation air $1,135 $499
SU0578 #08 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $525 $107
SU0578 #07 Y:2025 Use or replace with energy efficient substitutes $874 $58
SU0578 #06 Y:2025 Reduce space conditioning during non-working hours $9,354 $420
SU0578 #05 Y:2025 Eliminate or reduce compressed air usage $951 -
SU0578 #04 Y:2025 Turn off equipment when not in use $442 -
SU0578 #03 Y:2025 Disconnect ballasts $500 -
SU0578 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $7,562 -
SU0578 #01 Y:2025 Apply for tax-free status for energy purchases $15,025 -
NL0115 #06 Y:2025 Use or replace with energy efficient substitutes $111 $254
NL0115 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $341 $278