ITAC Assessment: SU0578
ITAC logo
ITAC Assessment: SU0578
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Wood Office Furniture
NAICS 337211: Wood Office Furniture Manufacturing
SIC 2521: Wood Office Furniture
Sales Range $100
M
to 500
M
# of Employees 144
Plant Area 750,000
ft2
Annual Production 104,107
units
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $409,833 7,156,373
kWh
Electricity Demand $151,240 38,620
kW-mo/yr
Electricity Fees $34,159 -
Natural Gas $292,828 65,251
MMBtu
LPG $1,555 46
MMBtu
Other Gas $58,821 65,251
MMBtu
TOTAL YEARLY COSTS $948,437
RECOMMENDED SAVINGS* $118,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $15,025 - - - - $15,025
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,562 - - $7,562
-
kW-mo/yr
- -
03 2.7122: Disconnect ballasts $500 - $447
7,840
kWh
$53
-
kW-mo/yr
- -
04 2.6218: Turn off equipment when not in use $442 - $50
876
kWh
$392
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $951 - $951
16,684
kWh
- - -
06 2.7224: Reduce space conditioning during non-working hours $9,354 $420 $1,207
21,167
kWh
- $8,147
-
MMBtu
-
07 2.4322: Use or replace with energy efficient substitutes $874 $58 $821
14,400
kWh
$329
-
kW-mo/yr
$(-275.6)
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $525 $107 $525
9,208
kWh
- - -
09 2.7314: Reduce ventilation air $1,135 $499 $506
8,871
kWh
- $629
-
MMBtu
-
10 2.6218: Turn off equipment when not in use $5,324 $2,320 $5,242
91,968
kWh
$82
-
kW-mo/yr
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $16,627 $14,880 $11,041
193,704
kWh
$4,551
-
kW-mo/yr
- $1,034
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $53,073 $79,597 $53,073
931,101
kWh
- - -
13 2.2511: Insulate bare equipment $294 $445 - - $294
-
MMBtu
-
14 2.4322: Use or replace with energy efficient substitutes $1,163 $2,080 $634
11,125
kWh
$60
-
kW-mo/yr
- $469
15 2.6211: Conserve energy by efficient use of vending machines $350 $745 $350
6,132
kWh
- - -
16 2.7135: Install occupancy sensors $574 $1,355 $574
10,067
kWh
- - -
17 2.2136: Install / repair insulation on steam lines $1,185 $2,822 - - $1,185
-
MMBtu
-
18 2.2614: Use cooling tower or economizer to replace chiller cooling $4,025 $15,784 - - $4,025
-
MMBtu
-
TOTAL RECOMMENDED $118,982 $121,111 $75,420
1,323,144
kWh
$13,028
-
kW-mo/yr
$14,005
-
MMBtu
$16,529
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs