| Assessment Year | 1989 |
|---|---|
| Principal Product | CHECK PRINTING & FORMS |
| NAICS |
n/a
|
| SIC | 2759: Commercial Printing, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 70 |
| Plant Area |
n/a
|
| Annual Production | 166,000
pieces
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $47,594 | 742,087 |
kWh
|
$0.064 |
| Natural Gas | $1,038 | 267 |
MMBtu
|
$3.89 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,235 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,078 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 02 | 2.8121: Apply for tax-free status for energy purchases | $1,307 | $250 |
$1,297
-
kWh
|
$10
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,597 | $2,545 |
$2,597
40,445
kWh
|
- | |
| 04 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,603 | $1,850 |
$1,603
55,100
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,040 | $3,000 |
$1,040
16,120
kWh
|
- | |
| 06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $610 | $1,000 |
$610
-
kWh
|
- | |
| 07 | 2.2511: Insulate bare equipment | $950 | $200 |
$950
14,947
kWh
|
- | |
| 08 | 2.7314: Reduce ventilation air | $710 | $450 |
$120
2,052
kWh
|
$590
-
MMBtu
|
|
| 09 | 2.7226: Use computer programs to optimize hvac performance | $418 | $300 |
$418
16,120
kWh
|
- | |
| TOTAL RECOMMENDED | $9,235 | $9,595 |
$8,635
144,784
kWh
|
$600
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $5,078 | $5,850 |
$4,478
89,392
kWh
|
$600
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs