ITAC Assessment: CO0165
ITAC logo
ITAC Assessment: CO0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CHECK PRINTING & FORMS
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area
n/a
Annual Production 166,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,594 742,087
kWh
Natural Gas $1,038 267
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,235 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,078

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
02 2.8121: Apply for tax-free status for energy purchases $1,307 $250 $1,297
-
kWh
$10
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,597 $2,545 $2,597
40,445
kWh
-
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,603 $1,850 $1,603
55,100
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,040 $3,000 $1,040
16,120
kWh
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $610 $1,000 $610
-
kWh
-
07 2.2511: Insulate bare equipment $950 $200 $950
14,947
kWh
-
08 2.7314: Reduce ventilation air $710 $450 $120
2,052
kWh
$590
-
MMBtu
09 2.7226: Use computer programs to optimize hvac performance $418 $300 $418
16,120
kWh
-
TOTAL RECOMMENDED $9,235 $9,595 $8,635
144,784
kWh
$600
-
MMBtu
TOTAL IMPLEMENTED $5,078 $5,850 $4,478
89,392
kWh
$600
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs