Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

667

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wood household furniture, except upholstered
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CC0031 #06 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $6,100 $3,000
CC0031 #05 Y:2023 Reduce the pressure of compressed air to the minimum required $3,751 -
CC0031 #04 Y:2023 Utilize controls to operate equipment only when needed $147 $340
CC0031 #03 Y:2023 Use or replace with energy efficient substitutes $34,115 $205,795
CC0031 #02 Y:2023 Utilize controls to operate equipment only when needed $14,525 $19,500
CC0031 #01 Y:2023 Recover waste heat from equipment $12,780 $15,000
CC0028 #11 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $49,090 $118,344
CC0028 #10 Y:2023 Utilize controls to operate equipment only when needed $5,953 $4,760
CC0028 #09 Y:2023 Use optimum size and capacity equipment $12,193 $75,000
CC0028 #08 Y:2023 Utilize controls to operate equipment only when needed $3,138 $6,000
CC0028 #07 Y:2023 Recover waste heat from equipment $5,053 $18,871
CC0028 #06 Y:2023 Replace high resistance ducts, pipes, and fittings $7,824 $12,573
CC0028 #05 Y:2023 Use / purchase optimum sized compressor $6,311 -
CC0028 #04 Y:2023 Close holes and openings in building such as broken windows $8,063 $20,000
CC0028 #03 Y:2023 Insulate bare equipment $3,687 $5,300
CC0028 #02 Y:2023 Insulate feedwater tank $1,517 $700
CC0028 #01 Y:2023 Reduce illumination to minimum necessary levels $3,157 $3,110
MI0370 #11 Y:2019 Close holes and openings in building such as broken windows $796 $134
MI0370 #10 Y:2019 Install occupancy sensors $1,149 $500
MI0370 #09 Y:2019 Lower temperature during the winter season and vice-versa $1,780 $580