Assessment Year | 2024 |
---|---|
Principal Product | Plywood Frames |
NAICS | 337122: Nonupholstered Wood Household Furniture Manufacturing |
SIC | 2511: Wood Household Furniture, Except Upholstered |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
84,500
ft2
|
Annual Production | 80,000
pieces
|
Production Hrs. Annual | 5,460
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $190,492 | 3,473,198 |
kWh
|
$0.055 |
Electricity Demand | $105,172 | 8,827 |
kW-mo/yr
|
$11.91 |
Electricity Fees | $2,323 | - |
|
- |
LPG | $29,396 | 1,352 |
MMBtu
|
$21.75 |
TOTAL YEARLY COSTS | $327,383 | |||
RECOMMENDED SAVINGS* | $71,418 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $12,780 | $15,000 | - | - |
$12,780
-
MMBtu
|
|
02 | 2.6231: Utilize controls to operate equipment only when needed | $14,525 | $19,500 |
$14,525
264,092
kWh
|
- | - | |
03 | 2.4322: Use or replace with energy efficient substitutes | $34,115 | $205,795 |
$23,320
424,008
kWh
|
$10,795
-
kW-mo/yr
|
- | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $147 | $340 |
$147
2,680
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,751 | - |
$2,564
46,613
kWh
|
$1,187
-
kW-mo/yr
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,100 | $3,000 |
$4,170
75,816
kWh
|
$1,930
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $71,418 | $243,635 |
$44,726
813,209
kWh
|
$13,912
-
kW-mo/yr
|
$12,780
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs