32
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1115 #06 Y:2025 | 06 | 2025 | Install compressor air intakes in coolest locations | $1,479 | $1,015 |
n/a
|
| UD1115 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $2,587 | $5,423 |
n/a
|
| UD1115 #04 Y:2025 | 04 | 2025 | Insulate bare equipment | $892 | $1,267 |
n/a
|
| UD1115 #03 Y:2025 | 03 | 2025 | Meter recycled water (to reduce sewer charges) | $1,016 | $760 |
n/a
|
| UD1115 #02 Y:2025 | 02 | 2025 | Optimize plant power factor | $2,927 | $3,700 |
n/a
|
| UD1115 #01 Y:2025 | 01 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $25,515 | $7,035 |
n/a
|
| UD0551 #04 Y:1998 | 04 | 1998 | Replace existing equipment with more suitable substitutes | $1,083 | $225 | |
| UD0551 #03 Y:1998 | 03 | 1998 | Install equipment (eg compactor) to reduce disposal costs | $2,400 | $7,000 | |
| UD0551 #02 Y:1998 | 02 | 1998 | Utilize higher efficiency lamps and/or ballasts | $7,897 | $10,073 | |
| UD0551 #01 Y:1998 | 01 | 1998 | Move product using mechanical means | $42,000 | $2,400 | |
| UD0442 #06 Y:1994 | 06 | 1994 | Recover waste heat from equipment | $8,910 | $10,000 | |
| UD0442 #05 Y:1994 | 05 | 1994 | Utilize higher efficiency lamps and/or ballasts | $1,952 | $6,200 | |
| UD0442 #04 Y:1994 | 04 | 1994 | Utilize higher efficiency lamps and/or ballasts | $1,818 | $3,360 | |
| UD0442 #03 Y:1994 | 03 | 1994 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $12,118 | $1,000 | |
| UD0442 #02 Y:1994 | 02 | 1994 | Purchase gas directly from a contract gas supplier | $3,335 | - | |
| UD0442 #01 Y:1994 | 01 | 1994 | Improved material handling (mixing and transfer) | $3,914 | - | |
| UD0363 #03 Y:1991 | 03 | 1991 | Reduce illumination to minimum necessary levels | $440 | - | |
| UD0363 #02 Y:1991 | 02 | 1991 | Reduce illumination to minimum necessary levels | $955 | $240 | |
| UD0363 #01 Y:1991 | 01 | 1991 | Install vinyl strip / high speed / air curtain doors | $4,743 | $40,000 | |
| UD0163 #06 Y:1985 | 06 | 1985 | Install timers and/or thermostats | $17,374 | $7,500 |