Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Household furniture
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1115 #06 Y:2025 Install compressor air intakes in coolest locations $1,479 $1,015
UD1115 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $2,587 $5,423
UD1115 #04 Y:2025 Insulate bare equipment $892 $1,267
UD1115 #03 Y:2025 Meter recycled water (to reduce sewer charges) $1,016 $760
UD1115 #02 Y:2025 Optimize plant power factor $2,927 $3,700
UD1115 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $25,515 $7,035
UD0551 #04 Y:1998 Replace existing equipment with more suitable substitutes $1,083 $225
UD0551 #03 Y:1998 Install equipment (eg compactor) to reduce disposal costs $2,400 $7,000
UD0551 #02 Y:1998 Utilize higher efficiency lamps and/or ballasts $7,897 $10,073
UD0551 #01 Y:1998 Move product using mechanical means $42,000 $2,400
UD0442 #06 Y:1994 Recover waste heat from equipment $8,910 $10,000
UD0442 #05 Y:1994 Utilize higher efficiency lamps and/or ballasts $1,952 $6,200
UD0442 #04 Y:1994 Utilize higher efficiency lamps and/or ballasts $1,818 $3,360
UD0442 #03 Y:1994 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $12,118 $1,000
UD0442 #02 Y:1994 Purchase gas directly from a contract gas supplier $3,335 -
UD0442 #01 Y:1994 Improved material handling (mixing and transfer) $3,914 -
UD0363 #03 Y:1991 Reduce illumination to minimum necessary levels $440 -
UD0363 #02 Y:1991 Reduce illumination to minimum necessary levels $955 $240
UD0363 #01 Y:1991 Install vinyl strip / high speed / air curtain doors $4,743 $40,000
UD0163 #06 Y:1985 Install timers and/or thermostats $17,374 $7,500