ITAC Assessment: SD0685
ITAC logo
ITAC Assessment: SD0685
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Wood panels finishing and cabinet components
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 90,000
ft2
Annual Production 1,825,000
pieces
Production Hrs. Annual 2,142
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,140 1,016,438
kWh
Electricity Demand $140,930 8,883
kW-mo/yr
Electricity Fees $21,145 -
TOTAL YEARLY COSTS $305,215
RECOMMENDED SAVINGS* $584,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,078 $2,362 $2,500
17,753
kWh
$1,578
-
kW-mo/yr
02 2.9114: Use solar heat to make electricty $11,104 $28,902 $7,516
53,380
kWh
$3,588
-
kW-mo/yr
03 2.3141: Use battery storage for demand control $556,956 $109,721 $(-118,229.8)
(-839,700)
kWh
$675,186
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,111 $3,285 $1,294
9,188
kWh
$817
-
kW-mo/yr
05 2.4223: Install direct acting units in place of compressed air pressure system in safety system $254 $1,200 $254
1,807
kWh
-
06 2.4133: Use most efficient type of electric motors $155 $4,450 $84
598
kWh
$71
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,543 $10,618 $5,850
41,546
kWh
$3,694
-
kW-mo/yr
08 2.4231: Reduce the pressure of compressed air to the minimum required $751 - $751
5,337
kWh
-
TOTAL RECOMMENDED $584,952 $160,538 $(-99,981.3)
(-710,090)
kWh
$684,934
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs