Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,600

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Furniture and fixtures
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1115 #06 Y:2025 Install compressor air intakes in coolest locations $1,479 $1,015
UD1115 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $2,587 $5,423
UD1115 #04 Y:2025 Insulate bare equipment $892 $1,267
UD1115 #03 Y:2025 Meter recycled water (to reduce sewer charges) $1,016 $760
UD1115 #02 Y:2025 Optimize plant power factor $2,927 $3,700
UD1115 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $25,515 $7,035
UC2506 #08 Y:2025 Install timers and/or thermostats $8,437 $1,150
UC2506 #07 Y:2025 Modify startup/shutdown times $18,810 -
UC2506 #06 Y:2025 Install partitions to reduce size of conditioned space $136 $557
UC2506 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,755 $1,600
UC2506 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $3,873 $75
UC2506 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $10,373 $6,979
UC2506 #02 Y:2025 Install occupancy sensors $1,938 $3,780
UC2506 #01 Y:2025 Change rate schedules or other changes in utility service $26,750 -
MI0457 #10 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,337 $10,164
MI0457 #09 Y:2025 Replace existing hvac unit with high efficiency model $3,712 $6,585
MI0457 #08 Y:2025 Meter waste water $2,180 $2,348
MI0457 #07 Y:2025 Turn off equipment when not in use $10,839 $2,400
MI0457 #06 Y:2025 Install vinyl strip / high speed / air curtain doors $7,391 $1,360
MI0457 #05 Y:2025 Install occupancy sensors $5,576 $918