Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wood products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0252 #05 Y:2025 Reduce space conditioning during non-working hours $399 $3,550
WM0252 #04 Y:2025 Install compressor air intakes in coolest locations $566 $3,607
WM0252 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $692 -
WM0252 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,152 $4,060
WM0252 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,906 $17,664
WI0484 #10 Y:2004 Utilize energy-efficient belts and other improved mechanisms $1,942 $1,054
WI0484 #09 Y:2004 Recover waste heat from equipment $2,689 -
WI0484 #08 Y:2004 Reschedule plant operations or reduce load to avoid peaks $3,010 -
WI0484 #07 Y:2004 Use waste heat from hot flue gases to preheat $4,880 $11,000
WI0484 #06 Y:2004 Insulate bare equipment $1,787 $400
WI0484 #05 Y:2004 Analyze flue gas for proper air/fuel ratio $2,240 $500
WI0484 #04 Y:2004 Use waste heat from hot flue gases to preheat $13,391 $5,500
WI0484 #03 Y:2004 Close holes and openings in building such as broken windows $14,141 $60,000
WI0484 #02 Y:2004 Install occupancy sensors $2,603 $3,060
WI0484 #01 Y:2004 Utilize higher efficiency lamps and/or ballasts $20,843 $44,480
WI0309 #06 Y:1997 Install equipment (eg compactor) to reduce disposal costs $1,299 -
WI0309 #05 Y:1997 Utilize energy-efficient belts and other improved mechanisms $1,518 -
WI0309 #04 Y:1997 Use demand controller or load shedder $5,016 $5,000
WI0309 #03 Y:1997 Apply for tax-free status for energy purchases $9,671 -
WI0309 #02 Y:1997 Purchase gas directly from a contract gas supplier $10,577 $500