379
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Hardwood veneer and plywood | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0658 #01 Y:2015 | 01 | 2015 | Modify current incentive program | $22,712 | $60,000 | |
| WM0050 #08 Y:2014 | 08 | 2014 | Upgrade controls on compressors | $1,111 | - | |
| WM0050 #07 Y:2014 | 07 | 2014 | Sell combustible waste | $39,202 | $97,000 | |
| WM0050 #06 Y:2014 | 06 | 2014 | Reduce illumination to minimum necessary levels | $3,302 | $2,100 | |
| WM0050 #05 Y:2014 | 05 | 2014 | Install occupancy sensors | $887 | $1,575 | |
| WM0050 #04 Y:2014 | 04 | 2014 | Turn off equipment during breaks, reduce operating time | $8,029 | - | |
| WM0050 #03 Y:2014 | 03 | 2014 | Utilize higher efficiency lamps and/or ballasts | $2,875 | $1,800 | |
| WM0050 #02 Y:2014 | 02 | 2014 | Turn off equipment during breaks, reduce operating time | $357 | - | |
| WM0050 #01 Y:2014 | 01 | 2014 | Reschedule plant operations or reduce load to avoid peaks | $6,104 | $8,000 | |
| OR0638 #07 Y:2014 | 07 | 2014 | Reschedule plant operations or reduce load to avoid peaks | $21,180 | $10,000 | |
| OR0638 #06 Y:2014 | 06 | 2014 | Replace existing equipment with more suitable substitutes | $40,207 | $13,800 | |
| OR0638 #05 Y:2014 | 05 | 2014 | Replace existing equipment with more suitable substitutes | $11,008 | $9,020 | |
| OR0638 #04 Y:2014 | 04 | 2014 | Minimize water usage | $1,003 | - | |
| OR0638 #03 Y:2014 | 03 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,466 | $8,550 | |
| OR0638 #02 Y:2014 | 02 | 2014 | Improve air circulation with destratification fans / other methods | $28,255 | $27,375 | |
| OR0638 #01 Y:2014 | 01 | 2014 | Establish burner maintenance schedule for boilers | $237,276 | $62,840 | |
| NC0512 #11 Y:2014 | 11 | 2014 | Eliminate or reduce compressed air usage | $440 | $560 | |
| NC0512 #10 Y:2014 | 10 | 2014 | Install occupancy sensors | $642 | $944 | |
| NC0512 #09 Y:2014 | 09 | 2014 | Utilize higher efficiency lamps and/or ballasts | $375 | $1,605 | |
| NC0512 #08 Y:2014 | 08 | 2014 | Utilize higher efficiency lamps and/or ballasts | $24,636 | $43,944 |