ITAC Assessment: OR0638
ITAC logo
ITAC Assessment: OR0638
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Plywood
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $100
M
to 500
M
# of Employees 514
Plant Area 1,000,000
ft2
Annual Production 292,705
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,638,001 54,724,000
kWh
Electricity Demand $742,126 105,184
kW-mo/yr
Electricity Fees $123,966 -
Natural Gas $105,639 16,905
MMBtu
Wood $3,040,000 1,223,560
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $347,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,183

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings
01 2.1231: Establish burner maintenance schedule for boilers $237,276 $62,840 - - $237,276
-
MMBtu
02 2.7243: Improve air circulation with destratification fans / other methods $28,255 $27,375 $22,478
448,032
kWh
$5,777
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,466 $8,550 $8,466
168,737
kWh
- -
04 3.4151: Minimize water usage $1,003 - $1,003
19,989
kWh
- -
05 4.652: Replace existing equipment with more suitable substitutes $11,008 $9,020 $11,008
219,406
kWh
- -
06 4.652: Replace existing equipment with more suitable substitutes $40,207 $13,800 $40,207
801,424
kWh
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $21,180 $10,000 - $21,180
-
kW-mo/yr
-
TOTAL RECOMMENDED $347,395 $131,585 $83,162
1,657,588
kWh
$26,957
-
kW-mo/yr
$237,276
-
MMBtu
TOTAL IMPLEMENTED $22,183 $10,000 $1,003
19,989
kWh
$21,180
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs