Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Millwork
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0915 #11 Y:2014 Lease / purchase baler; sell cardboard to recycler $7,301 -
UD0915 #10 Y:2014 Add area lighting switches $117 -
UD0915 #09 Y:2014 Utilize higher efficiency lamps and/or ballasts $129,321 $377,745
UD0915 #08 Y:2014 Cover open tanks $14,519 $39,186
UD0915 #07 Y:2014 Install motor voltage controller on lightly loaded motors $993 $2,575
UD0915 #06 Y:2014 Install motor voltage controller on lightly loaded motors $17,210 $23,600
UD0915 #05 Y:2014 Meter recycled water (to reduce sewer charges) $1,180 $700
UD0915 #04 Y:2014 Reduce the pressure of compressed air to the minimum required $2,815 $100
UD0915 #03 Y:2014 Utilize controls to operate equipment only when needed $7,714 $1,800
UD0915 #02 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $12,184 $1,200
UD0915 #01 Y:2014 Utilize energy-efficient belts and other improved mechanisms $2,262 -
UD0544 #10 Y:1998 Utilize energy-efficient belts and other improved mechanisms $769 -
UD0544 #09 Y:1998 Reduce illumination to minimum necessary levels $922 $700
UD0544 #08 Y:1998 Utilize higher efficiency lamps and/or ballasts $1,695 $3,472
UD0544 #07 Y:1998 Provide proper maintenance of motor driven equipment $2,054 -
UD0544 #06 Y:1998 Repair faulty louvers and dampers $2,092 $400
UD0544 #05 Y:1998 Eliminate leaks in inert gas and compressed air lines/ valves $4,145 $1,000
UD0544 #04 Y:1998 Reduce illumination to minimum necessary levels $6,427 $1,000
UD0544 #03 Y:1998 Turn off equipment when not in use $8,392 -
UD0544 #02 Y:1998 Begin a practice of predictive / preventative maintenance $13,720 $800