540
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Hardwood dimension and flooring mills | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0032 #05 Y:2008 | 05 | 2008 | Utilize higher efficiency lamps and/or ballasts | $3,681 | $5,100 | |
| TT0032 #04 Y:2008 | 04 | 2008 | Utilize higher efficiency lamps and/or ballasts | $3,906 | $10,250 | |
| TT0032 #03 Y:2008 | 03 | 2008 | Utilize higher efficiency lamps and/or ballasts | $6,704 | $7,000 | |
| TT0032 #02 Y:2008 | 02 | 2008 | Utilize higher efficiency lamps and/or ballasts | $15,496 | $57,000 | |
| TT0032 #01 Y:2008 | 01 | 2008 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $17,837 | - | |
| WV0386 #13 Y:2008 | 13 | 2008 | Utilize higher efficiency lamps and/or ballasts | $139 | - | |
| WV0386 #12 Y:2008 | 12 | 2008 | Analyze flue gas for proper air/fuel ratio | $884 | $1,000 | |
| WV0386 #11 Y:2008 | 11 | 2008 | Reduce the pressure of compressed air to the minimum required | $1,548 | $50 | |
| WV0386 #10 Y:2008 | 10 | 2008 | Establish a predictive maintenance program | $1,621 | $1,000 | |
| WV0386 #09 Y:2008 | 09 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,379 | $396 | |
| WV0386 #08 Y:2008 | 08 | 2008 | Utilize energy-efficient belts and other improved mechanisms | $2,790 | - | |
| WV0386 #07 Y:2008 | 07 | 2008 | Develop a repair/replace policy | $2,823 | $769 | |
| WV0386 #06 Y:2008 | 06 | 2008 | Use radiant heater for spot heating | $3,371 | $7,700 | |
| WV0386 #05 Y:2008 | 05 | 2008 | Insulate bare equipment | $4,653 | $920 | |
| WV0386 #04 Y:2008 | 04 | 2008 | Use waste heat from flue gases to heat space conditioning air | $7,586 | $8,100 | |
| WV0386 #03 Y:2008 | 03 | 2008 | Use waste heat from hot flue gases to preheat | $15,988 | $8,450 | |
| WV0386 #02 Y:2008 | 02 | 2008 | Use waste heat from hot flue gases to preheat | $16,673 | $8,525 | |
| WV0386 #01 Y:2008 | 01 | 2008 | Install equipment to utilize waste fuel | $140,425 | $517,666 | |
| MS0308 #04 Y:2006 | 04 | 2006 | Utilize energy-efficient belts and other improved mechanisms | $1,356 | $2,850 | |
| MS0308 #03 Y:2006 | 03 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,541 | $142 |