ITAC Assessment: MS0308
ITAC logo
ITAC Assessment: MS0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Wood Flooring
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 96,000
ft2
Annual Production 11,280
thousand feet
Production Hrs. Annual 6,552
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,317 2,657,400
kWh
Electricity Demand $25,038 7,869
kW-mo/yr
Electricity Fees $120,113 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,168

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4222: Install adequate dryers on air lines to eliminate blowdown $8,320 $2,753 - - - $8,320
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,951 $8,190 $4,547
74,771
kWh
$397
-
kW-mo/yr
$7 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,541 $142 $3,538
58,144
kWh
- $3 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,356 $2,850 $1,245
20,453
kWh
$110
-
kW-mo/yr
$1 -
TOTAL RECOMMENDED $18,168 $13,935 $9,330
153,368
kWh
$507
-
kW-mo/yr
$11 $8,320
TOTAL IMPLEMENTED $18,168 $13,935 $9,330
153,368
kWh
$507
-
kW-mo/yr
$11 $8,320
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs